N81 Tallaght Bypass

Ongoing Works Update

Traffic management measures associated with the replacement of the pedestrian bridge linking Greenhills Rd, at Main Street, Tallaght to St. Dominics.

To facilitate final construction of this bridge there will be traffic restrictions on the Greenhills Road between Main Street and Tallaght Bypass and on the Tallaght {N81) throughout September 2007.

Traffic restrictions will be as follows:-

Preparation Phase (8th August to 17th August)

The temporary replacement of the central median in preparation for the Phase 2 traffic management has been completed.

Phase 1 (3rd September to 14th September)

Traffic heading from M5O towards Tallaght will not be permitted to turn right into Greenhills Road. Traffic from the M50 and Templeogue should detour via Tallaght Road. Diversion signage will be displayed to advise motorists in advance.

Phase 2 (15th September to 22nd September)

During phase two of the works the section of Greenhills Road south of Tallaght Main Street will operate one way from the Bypass (N81) towards Main Street. The no right turn into Greenhills Road will remain in place for out of town traffic. The left turn from Tallaght Bypass into Greenhills Road will remain open. Traffic on Greenhills Rd and Main Street should detour via Main Street or Tallaght Road. Diversion signage will be displayed on site to advise motorists in advance.

During these works traffic lanes will be subject to layout modifications

Nightime Traffic restrictions:-